| Melbourne Crane rates are improving as the yard density is coming down. We are maximising stack run outs to reduce the dwell time on IMPORT containers and increase slot availability through the VBS. Hopefully all transport companies can get their required slots. We are not yet back on track, but we are reducing the delays. R&D has been busy today, but under control, with all zones fully booked. The average Truck Turnaround Time for the last 8 hours was 35 mins, while the average Container Turn Time was 19 mins. |